Asbestos Management Plan

Requirements in Brief

After a survey or assessment shows Asbestos Containing Materials (ACMs) are present or are likely to be present, regulation 4 of the Control of Asbestos Regulations (CAWR) 2012 requires the *duty holder to produce a written plan recording:

Surveyor
  • The risks from such known or presumed ACMs as identified in the assessment
  • Measures to be taken to reduce or eliminate any risks, including risk assessments and method statements where work on ACMs is to be undertaken in house
  • A plan for the continuous monitoring and maintenance of known or presumed ACM’s until removal of them is necessary. The results of the continuous monitoring must be recorded.

All elements of the plan must be reviewed and, where necessary, revised at regular intervals, particularly risk assessments accounting for any change of use of the premise. The plan when complete should identify all risks associated with the ACMs within the premises (regardless of how low the risk is) and the measures in place to reduce them.

The plan must be available to all persons (employees, contractors and or visitors to the premises) liable to disturb any of the known or presumed ACMs within the premises. This includes the emergency services.

View the CAWR 2012 regulation 4 in full here...

Recording Documents

PASS (UK) Ltd has developed two blank documents which can be used for the recording of an asbestos inspection and management plan based on the findings of the inspection. **The documents are entitled 'Management of Risks from Asbestos Containing Materials’ and ‘Blank Asbestos Inspection Report’ and they can be downloaded free of charge in both word and pdf. format.

Please contact us should you require assistance or have any feedback.

Audit Service

PASS (UK) Ltd cannot be held responsible for the information recorded on the above mentioned documents but provide an audit service that includes a visit to the premises named in the documents. Once satisfied that the information recorded fulfils the requirements of regulation 4 of the CAWR 2012, the documents will be given signed approval by us

Please contact us for further information and a quotation.

*The duty holder; person or persons who either own and occupy or who has under the terms and conditions of their tenancy or contract, an obligation, be it limited or not, to maintain and or repair the non-domestic premises which they occupy and in which they carry out their work.

**These word documents are not locked and may be adjusted or re-written to suit individual requirements. They have been created with blank pages inserted to enable two-side printing. These should be deleted if this option not be available.